7003 Exam Questions - Online Test


7003 Premium VCE File

Learn More 100% Pass Guarantee - Dumps Verified - Instant Download
150 Lectures, 20 Hours

surepassexam.com

It is more faster and easier to pass the Avaya 7003 exam by using Verified Avaya Avaya Communication Server 1000 for Avaya Aura® Implementation Exam questuins and answers. Immediate access to the Far out 7003 Exam and find the same core area 7003 questions with professionally verified answers, then PASS your exam with a high score now.

New Avaya 7003 Exam Dumps Collection (Question 3 - Question 12)

Q1. A customer is preparing to install software on the CPMG server and would like to display the boot sequence on the system terminal for the BIOS, BOOT ROM, and operating System.

Which port on the CPMG server provides this information?

A. Frontface TTY port 2

B. Frontface TTY PORT 1

C. Backplane 3-port connection TTY port 0

D. Frontface embedded LAN (ELAN) port 0

Answer: B


Q2. A technician is installing a new Communication Server (CS) 1000E Rls. 7x system for a

customer. The requirements include installation of IP telephones for a small group of inside sales people. The telephones have been configured and are ready to be registered.

Which two items are to be entered when performing the IP telephone registration? (Choose two)

A. The Directory Number

B. The Node ID

C. The Terminal Number

D. The Customer Number

Answer: B,C


Q3. A customer has a several analog telephones running of a Flexible Analog Line Card (FALC) in an IPMG. Users are able to receive calls on the telephone and have a conversation, however they cannot initiate a call as there is no dial tone.

What should be checked first?

A. Tone and digital loops (TDS), extended tone detector (XTD)

B. Physical connections, dsp resource availability, and tone loops

C. All tone and digit switch loops (TDS), IPMG registration status

D. All XTD and conference loops

Answer: C


Q4. A customer has Communication Server (CS) RLS. 7x system, and the technician wants to create an account capable of configuring a network Time Protocol (NTP) server.

What must be done to access the data and time parameters?

A. Click the reboot button in Base Manager to restart the system and access the date and time parameters.

B. Update the user role and permission mapping to include security Administrator and Time Administrator access group.

C. Navigate to UCM and click the refresh icon to refresh the screen of properties to access data and time parameters.

D. Update the user role and permission mapping to include Network Administrator access groups.

Answer: D


Q5. A customer with an existing Option 11C Rls. 5.5 chassis system plans to upgrade to a Communication Server (CS) 1000E Rls. 7x Standard Availability with a single IP Media Gateway (MG) 1000E chassis.

To complete the upgrade, which component in the Option 11C must be replaced?

A. SSC Card

B. Call Processor

C. Media Gateway

D. Digital Line Card

Answer: A


Q6. A technician is installing the Linux Base Operating System software on the CPDC server for the Avaya Aura system and steps away while the software is loading. When the technician returns, he verifies that the Linux base installation is complete and successfully installed.

What status can the technician verify to ensure the installation is successful?

A. There is no visible indication available.

B. The Linux server reboots and the FQDN login prompt appears.

C. The status of Linux Hardening items is displayed and the system reboots.

D. The Linux server reboots and the Linux Status Completion screen appears.

Answer: B


Q7. A customer has deployed a Communication Server 100 Rls. 7x system at their site. The technician has been asked to add the Call pickup feature to the 100 IP telephone in the sales department. The customer wants to be sure active calls not lost when the changes are made.

Which Phones Configuration feature can be enabled that will ensure changes to the telephone are not transmitted to the call server until the telephone are busy?

A. Bulk change

B. Courtesy change

C. Group change

D. Template change

Answer: B


Q8. A customer wants to build a new Ip node on their Communication Server (CS) 1000E system with three Signaling Servers. This node will support virtual trunks, IP media services, TPS and personnel directories. A technician logs into Elements manager to complete the configuration, after creating and saving the node configuration, the transfer now option chosen, then the servers are selected, the start sync is selected followed by restart application.

What is expected outcome from the system?

A. The node file will be transferred from Signaling Servers to the call servers, and INI files will be transferred from the call server to the selected servers.

B. The node file will be transferred from Call Servers to the Signaling servers, and the INI files will be transferred from the Call Servers to the selected servers.

C. The node file will be transferred from Signaling Servers to the Call Server, and the INI files will be transferred from Call Servers to the Signaling servers.

D. The node will be transferred from Element manager to the call server, and INI files will be transferred from Element manager to Call Server.

Answer: B


Q9. A technician is planning to upgrade a customeru2021s existing Communication Server 1000E Rls. 6.0 system. During the upgrade, a CPPM server card from storage will be added to provide an additional signaling server.

Which two statements describes what must be done to the CPPM server card to distinguished it as a signaling Server (Choose two)

A. Set switch 5 to position 1.

B. Set switch 5 to position 2.

C. Install one Compact Flash Drive (RMD) and one Hard Drive (FMD)

D. Install one Compact Flash Drives (one RMD and one FMD)

Answer: B,C

Explanation: From - NN43041- 310_05.06_Communication_Server_1000E_Installation_Commissioning.pdf - Doc

enclosed

See Page 52 - Text in Brackets [] are added.

"CP PM card dip switch settingsThe CP PM card used in a VxWorks-based Server configuration [Call Server] must have switch S5 in position 1 to indicate that a Compact Flash (CF) card is used for the Fixed Media Drive (FMD).

The CP PM card used in a Linux-based Server configuration [Signaling Server] must have switch S5 in position 2 to indicate that a hard disk is used for the FMD."


Q10. Refer to the exhibit.

A Communication Server 1000E Rls. 7 x customer is adding a new Human Resources department with eight IP telephone users. The customer has asked for the telephones to be programmed with consecutive Directory numbers (DNs) from their DID range (2000- 2099).

Which numbers sequence is available to meet the customeru2021s requirements?

A. 2001-2008

B. 2010-2021

C. 2050-5057

D. 2091-2099

Answer: D


P.S. Easily pass 7003 Exam with Surepassexam Verified Dumps & pdf vce, Try Free: https://www.surepassexam.com/7003-exam-dumps.html ( New Questions)