Cause all that matters here is passing the VMware 3V0-624 exam. Cause all that you need is a high score of 3V0-624 VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design Exam exam. The only one thing you need to do is downloading Testking 3V0-624 exam study guides now. We will not let you down with our money-back guarantee.

P.S. Guaranteed 3V0-624 free demo are available on Google Drive, GET MORE: https://drive.google.com/open?id=1LjlX-uv9pq5FHtolI_Z2JS6YcH60C1gT


New VMware 3V0-624 Exam Dumps Collection (Question 2 - Question 11)

New Questions 2

Drag each option to its appropriate concept.

Answer:


New Questions 3

A company is implementing a new ESXi host cluster at its New York data center.

u2022 The CIO has stated that the new ESXi cluster should be deigned with enough failover capacity to sustain two ESXi host failures.

u2022 Six ESXi hosts have been approved for this workload.

u2022 The ESXi hosts are to be purchased from Dell with these specifications:

u2022 2x10 core 2.2GHz Intel CPU

u2022 128 GB of memory

u2022 The workload is defined as 150 employee desktop virtual machines each with 3GB RAM reserved.

u2022 All virtual machines should be protected by vSphere High Availability Which are two true statements regarding failover capacity? (Choose two.)

A. vSphete HA can be configured to reserve 25% of memory capacity for failover.

B. vSphete HA can be configured to specify two dedicated failover hosts.

C. vSphere HA can be configured to reserve 35% of memory capacity for failover.

D. vSphere HA can be configured to specify one dedicated failover host.

Answer: CD


New Questions 4

A virtualization administrator has been tasked with migrating several business applications from physical to virtual. The administrator must also migrate the virtual machines from VMware Workstation to vSphere 6.5, using vCenter Converter Standalone 6.1.

In this scenario, when two source types are supported? (Choose two.)

A. powered-off Windows Server 2008 physical machine

B. powered-on Windows Server 2000 Workstation virtual machine

C. powered-off Windows Server 2008 Workstation virtual machine

D. powered-on Windows Server 2008 physical machine

Answer: AB


New Questions 5

A company's CTO is very concerned about web server outages that are caused by server hardware failures. Which feature can protect the web server virtual machine from this kind of outage?

A. vCenter High Availability

B. Proactive High Availably

C. High Availability Orchestrated Restart

D. High Availability Admission Control

Answer: A


New Questions 6

A customs has requested a vSphere 6.5 deployment design where ESXi hosts are provisioned with Auto Deploy. The customer requires that certificates can be automatically refreshed and renewed from the vSphere Web Client for ESXi hosts.

Which certificate policy should be configured for vCenter Server?

A. Thumbprint Mode

B. VMware Certificate Authority

C. Custom Certificate Authority

D. Subordinate Certificate Authority

Answer: A


New Questions 7

A company has developers located in Eastern Europe (EE) and a QA Department in Bermuda.

u2022 The company is planning to create an environment based on a blueprint of 4-8 virtual machines for each of the developers and one for every QA project.

u2022 The proposed configuration will allow each developer to work independently and be able to collapse and re-create the environment as needed.

u2022 QA Teams will be able to recreate the environment that is required for a specific application.

u2022 Individual virtual machines in the blueprint are being continually updated with newly available software packages.

u2022 The company is planning to use the vSphere Content Library to store images and synchronize them between sites.

Which four supported configurations can the company implement? (Choose four.)

A. EE and Bermuda libraries that are backed by an NFS file system.

B. EE and Bermuda vCenter Servers with Enhanced Linked Mode.

C. FTP protocol to transfer data between published in EE and subscribed in Bermuda libraries.

D. Published library in EE backed by an NFS file system while subscribed library in Bermuda is backed up by datastore.

E. A minimum 10 GbE connection between EE published and Bermuda subscribed libraries is required.

F. EE and Bermuda vCenter Servers without Enhanced Linked Mode.

Answer: ABCE


New Questions 8

A database administrator is operating a virtual machine (VM) configured with 16 vCPU and 64GB of RAM. A recent performance audit has indicated that this virtual machine is oversized and is using less than 60% of its configured CPU and memory capacity.

u2022 The ESXi host that contains this VM has 2 physical processors with 10 cores per processor, and 128GB of RAM.

u2022 This physical host's architecture is split into two equal NUMA nodes.

Which vCPU and RAM configuration for the VM allows for the most resources, but also provides the performance benefit of local NUMA access?

A. 16 vCPU and 32GB RAM

B. 4 vCPU and 16GB RAM

C. 10 vCPU and 64GB RAM

D. 12 vCPU and 64GB RAM

Answer: A


New Questions 9

A company has requested assistance with a new cross-site failover design to support business-critical applications.

u2022 It has two sites when are very well-connected, and latency is less than 5ms round trip.

u2022 The customer requires that its applications be restarted even in the event of a total site failure.

u2022 The applications must be kept online even when migrated during maintenance.

u2022 Storage arrays at either site support both synchronous and asynchronous replication. Which two options are accurate application requirements for this scenario? (Choose two.)

A. The design must ensure continuous application uptime even during a total site failure.

B. The design must prioritize application availability.

C. The design must ensure application recoverability at the second site.

D. The applications are latency-sensitive.

Answer: AB


New Questions 10

A company has requested assistance with a new cross-site failover design between two sites which will support business-critical applications. Latency between the sites is less than 5ms round-trip.

The company requires:

u2022 application must be restarted quickly in the event of a total site failure

u2022 allow for planned migration during maintenance

u2022 applications must be kept online even when migrated due to planned maintenance

Answer:


New Questions 11

A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:

u2022 The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.

u2022 The new severs have a 90-day delivery time.

u2022 A data center for disaster recovery has been selected, and it is 20 miles way and connected by MPLS.

u2022 The security team will continue to utilize its current investments and VM Encryption for the new environment.

u2022 The backup team currently uses Data Domain, and reports show an 8.1 compression and deduplication ratio for backups.

Based on the information obtained, which two statements are assumptions for the new design? (Choose two.)

A. MPLS will be used to connect the two data centers.

B. There is 180 days left of current capacity.

C. Data Domain will get an 8:1 compression and deduplication ratio with the new workloads.

D. A disaster will NOT affect both data centers.

Answer: BD